Individual feeder, dwelling panel and review (ITC-BT-15 and 17)
The individual feeder (DI) is the line that carries energy from the meter to the control and protection panel of each dwelling or premises. It is the last section of the service connection, and ITC-BT-15 sets how it is installed. Then comes the panel of ITC-BT-17, with the power control switch and the general and individual devices.
Individual feeder (ITC-BT-15)
It consists of phase and neutral, a protective conductor and, for tariffs with time-of-use discrimination, a control wire. The minimum cross-section of the phase and neutral conductors is 6 mm² copper; the control wire is 1.5 mm². Cables must be non-fire-propagating, low-smoke and suited to the required insulation voltage: consult the current ITC. It is installed in its own conduits or trunking, through common areas, with a minimum diameter set by the ITC.
The maximum voltage drop in the DI is also small. As a guide, 1 % if the meters are in more than one place, 0.5 % if they are fully centralised and 1.5 % in single-user supplies without a main line; consult the current ITC. The cross-section is chosen by the larger of the current capacity and voltage drop requirements.
DI vivienda básica: 5750 W -> I = 5750/230 = 25 A
S minima = 6 mm2 Cu; comprobar e%:
L = 25 m -> e = 2*25*25/(48*6) = 4,34 V = 1,89 % (> 1,5 %) -> subir a 10 mm2
con 10 mm2: e = 2*25*25/(48*10) = 2,60 V = 1,13 % (cumple)Control and protection panel (ITC-BT-17)
The panel is installed as close as possible to the dwelling's entrance. It contains, in this order: the power control switch (ICP), which limits the contracted power, the all-pole general circuit breaker (IGA), one or more residual current devices and a circuit breaker for each circuit. The panel height and accessibility conditions are in the current ITC.
- ICP: limits the contracted power.
- IGA: all-pole general cut-off (25 A minimum in basic electrification).
- RCD: 30 mA sensitivity in dwellings.
- Breaker per circuit: protects each circuit's cable.
[ICP] -> [IGA 25 A] -> [Dif 40 A / 30 mA] -> [PIA C1 10 A] [PIA C2 16 A] [PIA C3 25 A] ...Week review
Week 3 is about how much power (load estimation) and where it comes through (service connection). Remember: basic grade 5750 W and elevated 9200 W; service connection in the order service line, CGP, LGA, meters, DI, panel; very small voltage drops in LGA and DI; minimum DI cross-section of 6 mm². With that you can read the diagram of any block of flats.
The panel is the visible face of the installation for the user. A well-labelled panel, with the diagram attached and the switches identified, lets anyone cut a circuit safely. A messy panel is a sign that the installation may have other problems.
जो सीखा उसे परखें
प्रश्न 1 / 6Minimum design power for basic electrification:
✎ मेरे नोट्स
केवल इस ब्राउज़र में सहेजा गया। खाते में रखने के लिए साइन इन करें।0/5000 अक्षर