Service line, CGP, main supply line and meters (ITC-BT-11, 13, 14 and 16)
Service-connection installations are the bridge between the distributor's network and the user's internal installation. They follow a fixed order: service line, main protection box, main supply line, meters and individual feeders. In this lesson you study the first four links and in the next one, the last along with the dwelling's panel.
red -> ACOMETIDA -> CGP -> LGA -> CONTADORES -> DI -> cuadro vivienda
(ITC-11) (13) (14) (16) (15) (17)Service line (ITC-BT-11)
The service line is the branch that runs from the distribution network to the main protection box. It can be overhead, underground or mixed, depending on the area's network. It belongs to the distribution company, which installs and maintains it; the user requests the supply and pays the applicable connection charges. ITC-BT-11 sets the execution and safety conditions.
Main protection box (ITC-BT-13)
The CGP houses the fuses that protect the main supply line. It is placed in a location with free and permanent access from the public road, normally on the facade or in a niche in the boundary wall. It marks the boundary between the distributor's network and the customer's property, and its size and type depend on the current. The fuses are chosen to protect the line at the expected current.
Main supply line (ITC-BT-14)
The LGA joins the CGP to the meter centralisation. It is installed in conduit, trunking or duct, along common-use routes, with non-fire-propagating, low-smoke cables. Its minimum cross-section, as a guide, is 10 mm² copper. The maximum voltage drop is small: of the order of 0.5 % if the meters are fully centralised and 1 % if there are several centralisations; consult the current ITC.
Meters (ITC-BT-16)
In buildings the meters are grouped (centralised) in a room, cabinet or panel of common use and easy access, with suitable ventilation and protection. In detached houses the meter may be next to the CGP, forming a protection-and-metering box. Today meters are electronic and allow remote management by the distributor. ITC-BT-16 regulates location, dimensions and installation systems.
- Service line: owned by the distributor.
- CGP: fuses, boundary between network and customer.
- LGA: from the CGP to the meters, very small voltage drop.
- Meters: centralised, accessible, electronic.
LGA de 66,8 A con 10 mm2 Cu: comprobar intensidad admisible y caída de tensión
e(V) = sqrt(3) * L * I * cos(phi) / (gamma * S) (trifásico)
L = 15 m, I = 66,8 A, gamma = 48, S = 25 mm2 -> e = 1,732*15*66,8/(48*25) = 1,45 V = 0,36 %One last idea: from the CGP onwards everything is 'customer property' and therefore the responsibility of the customer or the owners' association. Before the CGP, any fault or intervention belongs to the distributor. Understanding that boundary saves you calling the wrong person when there is a problem.